WOKING CARE HOME
Project Overview
AVIDAN Group was appointed to deliver a comprehensive demolition and enabling works package at a former care home in Woking. The project was part of a larger redevelopment scheme and required sensitive handling due to its location on a busy high street with nearby residential properties.
The package extended beyond demolition — covering environmental remediation, recycled material reuse, and strategic on-site coordination with local authorities and residents.
Client: Greenoak Housing
Location: Woking
Duration: 4 Weeks
FULL PACKAGE COMPRISED OF:
- Pre-demolition surveys
- Section 81 application and planning
- Detailed risk assessments
- Phased 3D method statements
- Full internal soft strip
- Complete structural demolition
- On-site material crushing
- Installation of pile mat
- Reduce level excavation
- Asbestos removal and contaminated ground remediation
Key Achievements
- Coordinated traffic management plan to avoid high street disruption
- Active engagement with nearby residents to minimise impact
- Compliance with local authority deadlines and project approvals
- Efficient phasing and waste control under strict H&S protocols
Sustainability Efforts
99%
99%
99%
Overall material recovery rate across all waste streams
0
%
of 900 tonnes of 6F5 crushed material reused on-site for pile mat
0
%