Project Overview
AVIDAN Group undertook a comprehensive demolition and enabling works project at a former equestrian centre in Surrey. This multifaceted package included structural demolition, asbestos removal, excavation, and extensive on-site material recovery.
Located in a high-traffic area with local residents nearby, the project required close coordination with local authorities, strict traffic management, and COVID-19 safety protocols — all while meeting a defined redevelopment deadline.
Client: Lofthouse Residencies
Location: Surrey
Duration: 5 Months
FULL PACKAGE COMPRISED OF:
- Pre-demolition surveys
- Section 81 application and planning
- Comprehensive risk assessments
- Phased 3D method statements
- Full internal soft strip
- Structural demolition of all buildings
- Full scaffolding installation
- Precision cut & carve works
- Reduce level excavation
- Licensed asbestos removal
Key Achievements
- Continuous liaison with local residents to minimise disruption
- Full traffic management plan to protect local roadways
- Compliance with tight local authority timelines
- Safe execution under active COVID-19 restrictions
- Delivery of critical works without incident or delay
Sustainability Efforts
96%
96%
96%
of construction and demolition waste recycled and diverted from landfill
0
%
of 1,500 tonnes of crushed 6F5 reused on site
0
%
recovery of 75 tonnes of recyclable metals