Hastings
Project Overview
Location: Hastings
Duration: 2 Weeks
The projectionist room was built as a cantilevered extension, hanging off the side of the main building — which made reaching it, let alone dismantling it, a real challenge. During our surveys, we found that the space contained several asbestos-containing materials, both within the roof structure and underneath the floor. Because of this, the entire room was officially classed as “notifiable asbestos,” meaning it could only be removed by licensed specialists and required extremely careful, controlled handling throughout the demolition.
FULL PACKAGE COMPRISED OF:
- Removal of the projectionist room and all associated works.
- Section 81 demolitProvision of access solutions and scaffolding.ion notice application
- Full HSE compliance, including notifiable asbestos removal and statutory notifications.
Key Achievements
- Maintained strict 2-week program
- Liaised with local residents and ensured minimal disruption to local businesses
Sustainability Efforts
94%
94%
94%
Overall material recovery rate across all waste streams
0
%
of 450 tonnes of crushed 6F5 material recycled
0
%
recovery of 37 tonnes of scrap metal
