North London

Project Overview

AVIDAN Group was engaged to undertake a soft strip and preparatory enabling works package at a constrained site in North London. The project involved detailed pre-demolition planning, phased execution, and careful consideration of adjacent structures and limited access points.

Surrounded by neighbouring residential properties, the site presented logistical and spatial challenges. Through close coordination and meticulous planning, AVIDAN delivered the works with zero disruption — showcasing our capability in handling high-risk, confined urban environments with care and precision.

Location: North London
Duration: 4 Months

FULL PACKAGE COMPRISED OF:

Key Achievements

Sustainability Efforts

97%

Overall material recovery rate across all waste streams

97%
0 %

of construction and demolition waste diverted from landfill

0 %

recovery of 75 tonnes of recyclable metal