Project Overview
AVIDAN Group was appointed to deliver a full demolition and enabling works package at a former teaching block within Farnborough Technical College. This project marked a major phase in the redevelopment of the site, requiring technical execution, stakeholder communication, and a strong focus on sustainability.
In addition to the physical deconstruction, our works placed emphasis on material recovery and environmental responsibility, aligning with both planning conditions and the client’s programme milestones.
Client: Concept
Location: Farnborough
Duration: 3 Months
FULL PACKAGE COMPRISED OF:
- Pre-demolition surveys and reporting
- Section 81 demolition notice management
- Site-specific risk assessments
- 3D phased method statements and logistics planning
- Full internal soft strip
- Structural demolition of the teaching block
- Scaffold erection across demolition zones
- Cut & carve works within key structural areas
- Reduce level excavation
- Asbestos removal in compliance with HSE regulations
Key Achievements
- Engaged with local residents to minimise disruption in a high-traffic location
- Implemented a detailed traffic management plan to protect local infrastructure
- Delivered works under strict COVID-19 safety protocols
- Achieved project deadlines set by the local authority
- Completed all works without safety incidents or programme delays
Sustainability Efforts
96%
96%
96%
of total construction & demolition waste recycled and diverted from landfill
0
%
of 1,500 tonnes of crushed 6F5 reused for groundwork applications
0
%
recovery of 75 tonnes of recyclable metals