Drummond House
120,000 SQFT
former RBS building
Project Overview
The Drummond House project stands as a testament to the adaptability, precision, and excellence that defines AviDan Group Ltd.
As the former headquarters for RBS Bank in Scotland, transforming this iconic building on a 13-acre site was a task that demanded a high level of expertise and meticulous planning.
The building presented a range of unique challenges. It was not just any corporate building; it housed a massive safe area with one-meter-thick concrete walls, layers of 60mm steel bar, and a foundation ring beam sat onto 1.3M diameter concrete piles. Additionally, a large basement level lay hidden beneath the ground.
Location: Edinburgh
Building Size: 120,00 sqft
Duration: 14 months
FULL PACKAGE COMPRISED OF:
- Pre-demolition surveys and reporting
- Section 81 demolition notice application
- Full site risk assessment
- Phased 3D method statements and planning
- Complete internal soft strip of former office interiors
- Full Demolition
- Foundation Removal
- Crushing
Key Achievements
- Coordinated with local residents to minimise disruption in a busy city setting
- Implemented a traffic and pedestrian management strategy approved by local authorities
- Completed all works within deadline parameters
- Ensured methodical and controlled dismantling of non-structural elements
- Delivered complex project setup with zero safety incidents
Sustainability Efforts
97%
Overall material recycling achieved across the strip-out programme
recovery of 750 tonnes of recyclable metal
of all construction and demolition waste diverted from landfill